Original Research Article

Procurement Process Quality And Project Performance Of Taraba Road Construction And Maintenance Agency

ISSN 2979-8582  ·  Article No. 061

ADI Daniel David Undie Unung Philip Samuel Ishaya

Publication Details

Publication Date
10/08/2026
Volume / Issue
Vol 1, Issue 3 (2026)
Article No.
061
Journal
British Journal of Contemporary Research
Received
28 Jul 2026
Views
26
Downloads
11
Affiliations

ADI Daniel David: Business Administration, Faculty of Management Sciences, Federal University Wukari, Taraba state , Nigeria

Undie Unung Philip: Business Administration, Faculty of Management Sciences, Federal University Wukari, Taraba state , Nigeria

Samuel Ishaya: Business Administration, Faculty of Management Sciences, Federal University Wukari, Taraba state , Nigeria

Abstract

This study examined the effect of procurement process quality on the project performance of Taraba Road Construction and Maintenance Agency in Taraba State, Nigeria. Specifically, the study investigated the influence of open bidding, public bid opening, and e-procurement systems on project performance measured by schedule adherence, cost performance, and quality compliance. The study was anchored on Agency Theory (Jensen & Meckling, 1976). A quantitative survey research design was adopted. The target population comprised 1,900 TARCMA staff, from which a sample of 320 respondents was selected using stratified random sampling. A structured questionnaire was used for data collection, with reliability established using Cronbach's Alpha (α = 0.85). Data were analysed using multiple regression analysis. The findings revealed that open bidding has a statistically significant effect on project performance (β = 0.241, p < .001). Public bid opening showed the strongest positive relationship with project performance (β = 0.372, p < .001). E-procurement systems also demonstrated a statistically significant effect (β = 0.305, p < .001). The regression model was significant (F = 164.782, p < .001), with an R Square value of 0.615. Consequently, all three null hypotheses were rejected. The study concludes that procurement process quality significantly influences TARCMA's project performance. It is recommended that TARCMA should strengthen open bidding practices, institutionalize public bid opening sessions, and accelerate e-procurement adoption. The study contributes empirical evidence on procurement-performance relationships in Taraba State, validating Agency Theory in the Nigerian subnational public procurement context.

Keywords

Procurement Process Quality Open Bidding Public Bid Opening E-procurement Systems Project Performance

License

CC BY 4.0

This article is published under the Creative Commons Attribution 4.0 International License . Free to read, share, and adapt with attribution.

Cite This Article

ADI Daniel David, Undie Unung Philip, Samuel Ishaya (2026). Procurement Process Quality And Project Performance Of Taraba Road Construction And Maintenance Agency . British Journal of Contemporary Research, 1(3), Article 061. https://doi.org/10.67693/BJCR-LFEKCP3A
ADI Daniel David. “Procurement Process Quality And Project Performance Of Taraba Road Construction And Maintenance Agency .” British Journal of Contemporary Research, vol. 1, no. 3, 2026.
ADI Daniel David. “Procurement Process Quality And Project Performance Of Taraba Road Construction And Maintenance Agency .” British Journal of Contemporary Research 1, no. 3.

Metadata

ISSN 2979-8582
DOI Prefix 10.67693
Tracking ID BEX_JUL_26_233

British Journal of Contemporary Research

Open Access · Peer Reviewed · Published by Bexford Publishing Ltd

Browse All Issues
Join Community